Procomm location 2, September - October 2000

back to eyrich.com

Click on image to enlarge

P9150007.jpg (45352 bytes) P9150008.jpg (68536 bytes)
Corey preparing the server area Broom sticks can be very useful.
P9220009.jpg (64168 bytes) P9250052.jpg (65947 bytes)
Corey running cable in factory. Lourdine operating the fork truck.
P9250053.jpg (76476 bytes) P9250054.jpg (68363 bytes)
   
PA270001.jpg (57661 bytes) PA270002.jpg (52710 bytes)
Move Day:
Laura and Corey duck the camera, while a battle plan is discussed.
Concedes a little
PA270003.jpg (64139 bytes) PA280004.jpg (66509 bytes)
Laura finally gives in. Corey installing switch and hub enclosure in factory.
PA280005.jpg (66943 bytes) PA280006.jpg (72038 bytes)
PA280007.jpg (79352 bytes) PA280012.jpg (104795 bytes)
Due to budget constraints conduit was not an option, instead we made use of U nails and bailing wire. Everything did certify to Cat-5 using a Penta scanner, even with the lights on.
PA280008.jpg (83864 bytes) PA280009.jpg (82082 bytes)
PA280010.jpg (73419 bytes) PA280011.jpg (75915 bytes)
The fork truck was very useful. Fun to drive too!
PA280018.jpg (72557 bytes) PA280013.jpg (49526 bytes)
  New home for the server, a HDD died during the move. Dell promptly replaced it.
PA280016.jpg (54411 bytes) PA280017.jpg (60280 bytes)
The trailer full of office equipment we moved  to the new site.  

back to eyrich.com